Finished Bathrooms

bs-bath-1-111314

This post first appeared on Brownstoner.com on November 17, 2014

Designing the bathrooms in a narrow house was a challenge. One option was to forgo having an office to accommodate a massive long master bathroom. I’ve never been the type of person that needed a huge home or bathroom — and I always wondered who were those people on HGTV that insisted on having double vanities. So the smaller but fully functional master bath won out.

Now, don’t get me wrong. The en suite master bath is in no way tiny. It does have a tub and standing shower but there isn’t much room in there except for the necessities and I’m fine with that. The master floor tiles came from a company in California. I searched high and low for inexpensive patterned concrete tiles and there isn’t such a thing.

And the electrician put the bathroom sconce too low. To remedy that problem, I need to a find a horizontal medicine cabinet.

To save on costs, the new guest bathroom is actually an existing bathroom off the hall in the old house configuration. Crazy how much money you can save by not moving plumbing. The downside is that things are really tight but cozy. The Moroccan-inspired floor tiles in the guest bathroom, pictured above, were also pricey but luckily I didn’t need a lot. And at the store where I purchased them, if your designer or architect places the order then you get a 10 to 15 percent discount, depending on the style. The wall tiles are from Overstock.com.

I’m debating adding a shower enclosure to the claw foot tub. Reviews from my few overnight guests have been mixed. My mom loved not having an enclosure, as did my friends who stayed over with their kids. But another set of friends said the current setup was awkward. But I must say, I love not sharing a bathroom with guests. Continue reading

Advertisements

Always check the tile box…ALWAYS

The correct tile

A few weeks ago, my contractor changed the configuration of the studio bathroom.  The new configuration actually works better than the original plan.  When he changed the plan  I asked him to let me know how much more tile he needed.  In all honesty, I didn’t push the issue and looking back I should have been more proactive and had the measurements taken on the spot. Well, I didn’t do that and last week I got a frantic call from the project manager that they needed more tile ASAP.  I went to the tile store to reorder the tile.  The tile arrives the next day and my project manager goes and picks up the tile. I come by the house later the following day and to my horror the guys are putting up the wrong tile. Seems that the tile store filled the order with the wrong tile and the contractor nor the project manager checked the box before leaving the store or even before bringing it to the house.

All this was made worse because the previous day I had conversations with the project manger and the contractor about being proactive and being able to order things like tile correctly without me being involved.  Anyway, I made the guys take down the incorrect tile but the tile store is orthodox and therefor not open on Friday and Saturday.  I waited until Sunday to make the changes and asked them to check the boxes twice.  The guys are going to put up the correct tile tomorrow, I’ll keep you posted.